TSM is proud to announce the successful completion of a major heating upgrade at Wembley Police Station.
As part of the project, we replaced the existing dual heating boiler, which had reached the end of its operational life, with a new dual Ideal boiler system. The installation was carefully planned to maintain uninterrupted heating and hot water throughout the works, with temporary provisions in place where required to ensure continuity of service.
In addition, seven pump sets serving various heating and ventilation systems across the station were replaced. Working closely with the site team, the project was delivered safely, efficiently, and with minimal disruption to day-to-day operations.
The upgrade also included the installation of two new hot water cylinders, replacing the existing gas-fired water heaters to further enhance system performance and energy efficiency.
A big thank you to our team, partners and everyone involved in delivering another successful project. We’re proud to continue providing high-quality engineering solutions that keep essential public buildings operating at their best.